Home > Construction & Decoration > Construction Equipment & Tools > Scaffolding > Hot Dip Galvanized Cuplock Scaffolds for Building Cuplock System

Hot Dip Galvanized Cuplock Scaffolds for Building Cuplock System

Hot Dip Galvanized Cuplock Scaffolds for Building Cuplock System photo-1
Hot Dip Galvanized Cuplock Scaffolds for Building Cuplock System photo-2
Hot Dip Galvanized Cuplock Scaffolds for Building Cuplock System photo-3
Hot Dip Galvanized Cuplock Scaffolds for Building Cuplock System photo-4
Hot Dip Galvanized Cuplock Scaffolds for Building Cuplock System photo-5
Hot Dip Galvanized Cuplock Scaffolds for Building Cuplock System photo-6
US$ 1 - 1.5 MOQ: 20000 Kilograms
Key Specifications
Get Latest Price
Place of Origin:
Jiangsu, China
Brand Name:
OEM
Model Number:
Cuplock Scaffolding
Payment & Shipping
Payment Methods:
Port of Shipment:
Nanjing
Delivery Detail:
Delivery time depends on order quantity.
Place of Origin Jiangsu, China
Brand Name OEM
Model Number Cuplock Scaffolding

Cuplock System, one of the most popular scaffolding system in the world. With Top Cup, Bottom Cup and Blad, different size of Standards, Ledgers, Braces are mounted for any construction use.

Hot dip Galvanized Cuplock Scaffolds for Building Cuplock system

 

Standard

 

Hot-dip galvanized steel. Ø 48.3 x 3.2 mm. Equipped with Top Cups and Bottom Cups in which Transoms, Ledgers and Braces are to be mounted. Distance between Rosettes: 500 mm.

Art. Length
(m)
Weight
(Kg)
Detail
OSC-S-050 0.50  3.53   
OSC-S-100 1.00  6.31   
OSC-S-150 1.50  9.05   
OSC-S-200 2.00  11.82   
OSC-S-250 2.50  14.57   
OSC-S-300 3.00  17.34   

 

 

Ledger

 

Hot-dip galvanized steel. Ø 48.3 x 3.0 mm. Mounted into the space between Top Cup and Bottom Cup with the Blade, thus securing a rightangled scaffold. Serves as a guardrail.

 

Art.

Length
(m)

Weight
(Kg)

Detail

OSC-L-060

0.6

2.47

 

OSC-L-100

1

3.92

 

OSC-L-120

1.2

4.28

 

OSC-L-130

1.3

5.01

 

OSC-L-150

1.5

5.73

 

OSC-L-180

1.8

6.81

 

OSC-L-200

2

7.54

 

OSC-L-250

2.5

9.35

 

 

 

 

 

 

Brace

 

Hot-dip galvanized steel. Mounted into the space between Top Cup and Bottom Cup with the swivel Blade. Diagonal braces should be placed on at least every fifth section starting with the outer ones.

 

Art.

Length
(m)

Weight
(Kg)

Detail

OSC-B-1

1.8*1.5

8.25

 

OSC-B-2

1.8*2.0

9.31

 

OSC-B-3

2.5*1.5

9.99

 

OSC-B-4

2.5*2.0

10.86

 

OSC-B-5

3.0*2.0

12.1

 

 

 

 

 Packaging & Shipping

 Packing: Packed with steel pallets and loaded with container, ensure sea transportation.

Shipping: 20 days after reception of L/C or deposit.

Hot dip Galvanized Cuplock Scaffolds for Building Cuplock system

 Hot dip Galvanized Cuplock Scaffolds for Building Cuplock system

Our Services

 Your inquiry to our product will be replied within 24hours.

• Experienced sales team are able to answer all your inquiries.

• 10 years experienced tech. team could meet all your demands.
• OEM services could be provided, we are willing to marking logo or paste stickers for you.
• Good after-sale service offered, multiple solutions will be provided for problem.

 


Send Inquiry to This Supplier

Message
0/5000

Want the best price? Post an RFQ now!
Business Type
Trading Company
Year Established
2013
Factory Size
Below 1,000 square meters
Total Employees
11 - 50 People

Recommended Categories

Explore top categories and find suppliers for your specific needs