Scaffold Plank and Scaffold Platform and Steel Plank
Specifications
Productivity advantagesPrice advantages
Geographical advantage, near the tianjin port
Own export and import right
steel plank can replace timber or bamboo plank, construction workers can walk on that.There are many different sizes and materials of the steel plank, we can make that products according to the customer's requirements
1.Facilitated passage by two hooks
2.Works with all styles of modular system
3. do not absorb water or chemicals
We can supply all kinds of galvanized steel plank with hole and without hole
| Type | Scaffolding |
| Material | Q235 Material is as per customer' s demand |
| Color | silver, etc. as customer' s requirement |
| Surface Treatment | Hot dip galvanised |
| Advantages | Top quality, Competitive price, Timely delivery, Good Service, Standard package, Easy installation/disassembly, Professional manufacturer |
| Certification | ISO9001: 2008, SGS |
| Main Market | North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe |
| Minimum order | one 20' container |
| Supply ability | 2000 tons/month |
| Port | xingang,TIANJIN |
| Currency | USD |
| Payment | L/C, T/T |
| Package | Factory steel pallet, safe and standard package |
| Length: | as customer's request |
If you are interested in any products, please contact with us without any hesitate!
welcome to visit our factory and check the products with your eyes.
Send Inquiry to This Supplier
You May Also Like
-
Types of Scaffolding Sleeve CouplerUS$ 0.1 - 0.1MOQ: 100 Pieces
-
2016 Practical Plastic Safety Tag For Scaffolding WorkingUS$ 9 - 10MOQ: 500 Boxes
-
Forged German Type Fixed Scaffolding CouplersUS$ 1 - 1MOQ: 1000 Pieces
-
Frp Corrugated Tube for LadderUS$ 2.5 - 18MOQ: 2000 Meters
-
High Quality Arch Steel Structure TrestleUS$ 1,300 - 1,400MOQ: 22 Tons
-
Color Zinc Plated Scaffold Right Angle CouplerNegotiableMOQ: 100 Pieces
-
BS1139 Type Drop Forged Scaffolding Double CouplerUS$ 1.5 - 2.5MOQ: 1000 Pieces
-
CouplersUS$ 2 - 11MOQ: 10000 Pieces
-
LVL for Struction ScaffoldUS$ 230 - 430MOQ: 23 Cartons
-
Pre-galvanized Hot Galvanized Painted Adjustable Heavy or Light Steel PropUS$ 5 - 5MOQ: 100 Pieces