Home > Construction & Decoration > Prefabricated Building > Workshops & Plants > New Design Tools Used for Mechanical Workshop With Great Price

New Design Tools Used for Mechanical Workshop With Great Price

New Design Tools Used for Mechanical Workshop With Great Price photo-1
New Design Tools Used for Mechanical Workshop With Great Price photo-2
New Design Tools Used for Mechanical Workshop With Great Price photo-3
New Design Tools Used for Mechanical Workshop With Great Price photo-4
New Design Tools Used for Mechanical Workshop With Great Price photo-5
New Design Tools Used for Mechanical Workshop With Great Price photo-6
US$ 22 - 32 MOQ: 200 Square Meters
Key Specifications
Get Latest Price
Place of Origin:
Henan, China
Brand Name:
CangLong
Model Number:
steel structure workshop building
Payment & Shipping
Payment Methods:
Port of Shipment:
Qingdao
Delivery Detail:
Delivery time depends on order quantity.
Place of Origin Henan, China
Brand Name CangLong
Model Number steel structure workshop building

 New design tools used for mechanical workshop with great price

Steel Materials list

Bellow materials are general used in steel buildings , but we often customized each type depend on clients requirment .

Projects name : New design tools used for mechanical workshop with great price

Item Name Materials Characteristics Material Grade Surface Treatment
Steel Column H shape,Box,Steel Pipe,Hot tolled sheet Q235B,Q345B Paint or Hot dip Galvanized
Steel beam H shape,Box,Steel Pipe,Hot tolled sheet Q235B,Q345B Paint or Hot dip Galvanized
Steel Bracing Steel Rod,Steel Pipe,Angle Steel Q235B,Q345B Paint or Hot dip Galvanized
Steel Purlin C or Z purlins(Thickness1.8mm~3.0mm) Q235B,Q345B Hot dip Galvanized
External Wall panels,Roof panels Single colorful corrugate steel sheet,sandwich panels with EPS,Rock wool,PU. Galvanized Steel+Painting Alu-zin 150g,Fluorocarbon pain
Steel buildings Door Slidding or Rolling door Steel or Aluminum sheet Paint or Hot dip galvanized
Steel buildings Windows Aluminum alloy-Glass,Aluminum alloy-shutter T=1.0-2.0mm Alloy
Skylighting panels FRP T=1.5mm-1.8mm Coefficient of thermal expansion:2.2x10-5/cm Light Tranmitar 85%
Ventilator Turbine ventilator on a ridge Steel,Stainless steel ,PC Paint or Hot dip Galvanized
Gutter Galvanized steel plate,Stainless steel plate T=2.0mm Hot dip galvanized
Downpipe PVC pipe,color steelpipe Y=0.5mm Dia110mm paint
Hight Bolt Ordinary ,High strength 10.9S,4.8S Hot dip galvanized,Steel
Ground bolts Steel RodM24,M27,M30,M33,M39,M42 10.9S Steel
Steel&panels&sheets

steel structure frame and roof panels/wall panels/accessories almost like them:

New design tools used for mechanical workshop with great price 

Construction calss

(1)Simple Steel Construction  

Main structure

Single span: L -shorter than 18m, H -lower than6m

Maintenance system

Roof

Colored sheet with 50mm glass wool

Wall

Colored steel sheet

Door

Wind resistance rolling door(within 10m2)

Window

Very few

Suitable market

No snow, wind load below 0.4kn/m2

 

(2)Standard SteelConstruction  

Main structure

Single span: L -shorter than 24m, H -lower than8m

Maintenance system

Roof

Colored sheet with 50mm glass wool

Wall

Colored steel sheet or 50mm EPS sandwich board

Door

Wind resistance rolling door(within 15m2)

Window

Alu. Alloy (can use with skylight)

Suitable market

Snow loading below 0.5kn,wind loading below 0.5kn/m2

 

(3)Coastal(High Wind Speed)SteelConstruction

Main structure

Single span: L -shorter than 18m, H -lower than 6 m

Maintenance system

Roof

Colored sheet with 50mm glass wool

Wall

Colored steel sheet or 50mm EPS sandwich board

Door

Wind resistance rolling door(within 15m2)

Window

Alu. Alloy (can use with skylight)

Suitable market

Snow loading below 0.7kn,wind loading below 1.2kn/m2

 

(4)Cold Region(Heavy Snow) SteelConstruction  

Main structure

Single span: L -shorter than 18m, H -lower than 6 m

Maintenance system

Roof

Colored sheet with 50mm glass wool

Wall

Colored steel sheet or 50mm EPS sandwich board

Door

PU foamed rolling door

Window

Alu. Alloy (can use with skylight)

Suitable market

snow loads below 3kn, wind load below 1KN/M2

 

(5)SteelConstruction  with Crane(5T,10T,15T,20T)

Main structure

Single span: L -shorter than 20m, H -lower than 10 m

Maintenance system

Roof

Colored sheet with 50mm glass wool

Wall

Colored steel sheet or 50mm EPS sandwich board

Door

Wind resistance rolling door (within 15m2)

Window

Alu. Alloy (can use with skylight)

Suitable market

Snow 0.5kn, wind load below 0.5kn/m2

Connected Detail

All steel structure warehouse,workshop ,storage ,steel prefabricated house , prefab home,prefab villas ,Steel Beams and Pillars connecteed Detail:

New design tools used for mechanical workshop with great priceSteel Beams and Brace connected Detail:

New design tools used for mechanical workshop with great price

Foundation Steel Ground bolts Detail :

New design tools used for mechanical workshop with great priceNew design tools used for mechanical workshop with great price 

Customers Visit

 New design tools used for mechanical workshop with great price is our company main products , they give high comments to our company qulity and service .

New design tools used for mechanical workshop with great price 

Our steel workshop

Who Are We ?

   We are professtional factory with operation since 2007, who is specializing in post frame steel buildings. Our individually engineered permanent structures are the best choice for customers requiring speed of construction and economy coupled with aesthetic value. Our buildings are ideal for residential, commercial , agricultural ,industrial and chemical factories ,warehouses & stores , hospitals & clinics,multi-storey buildings , supermarkets ..

Why is CangLong Steel Structures the Right Choice?

  Your investment is an important decision and should be realized through a financially stable company.  Our deep community roots and stout economic strength gives us an exceptional advantage in hiring experienced professionals who will complete your project to your expectations.

The Edge

 Competitive Prices Our production capacity (approximately 20000 metric tons annually) together with effective

 and economic engineering and manufacturing methods enable us to offer the most competitive prices in the industry.

Fast Quotations

 Quotations for simple buildings can be submitted quickly due to vast experience of our staff and the advanced 

software we use.

Fast Delivery 

 (1)We are able to design, detail, fabricate and supply simple buildings in approximately 4 weeks. 
 (2)Most of our buildings are delivered and erected within 8 weeks (this relies on various factors such as stock 

position, weather etc).
Site Supervision 

  (1)A site supervisor is always present at site to ensure that work is being carried out satisfactorily.
  (2)Any problems that arise are quickly dealt with to minimise any delays. 
  (3)Safety on site is also made a priority.

New design tools used for mechanical workshop with great price 

FAQ

1. Common type of the industrial steel structure building/Prefabricated house?

Reply: Portal frame is the usual type in the industrial workshop and warehouse shed. Other types also could be designed and manufacturer as per clients' request.

2. What's the quality grade of the steel structure components?

Reply: Q345 is used for main steel structure, Q235 is used for secondary steel structure. 
3. 
How about the delivery time?
Reply: Usually,within 20-25 days after the order confirmed, also depends on the order quantity.
4. 
How about the derust grade?
Reply: Ball blasting Sa2.5 on main steel structure; 
manual derust St2.0 on secondary steel structure.
5. 
What is kind panel used for the roof and wall?
Reply: Color corrugated steel sheet and sandwich panel could be used. Sandwich panel performs well on the heat insulation,sound insulation.Common sandwich materials are EPS, glass wool and PU sandwich panels.
6. 
How to install it?

Reply: We will furnish you the detailed construction drawing and the construction manual which could help you to erect and install the building step by step. We also could send the engineer to your local to help you if need. if you have no workteams , we can send our professtional teams to install for you.

7. Maintenance:

Reply: Finish paint need be done after the frame installed, and do it again after 6-8 months. So the surface will stay more time.

8.Prefabricated warehosue/workshop/Prefab house/Storage Life :

 Reply : All steel structure frame life is more than 50 Years , all caldding sheets are about 20 Years .

  Welcome you to send inquiry to our company NOW ,we would like to supply best service for you !

New design tools used for mechanical workshop with great priceContact : Ada Gao Whatsapp/Viber/wechat:+86 15981850388

   

Send Inquiry to This Supplier

Message
0/5000

Want the best price? Post an RFQ now!
Business Type
Trading Company
Year Established
2008
Factory Size
Below 1,000 square meters
Total Employees
301 - 500 People