Home > Construction & Decoration > Prefabricated Building > Prefabricated Hotel > Beautiful Design Light Garage Steel Prefabricated Houses

Beautiful Design Light Garage Steel Prefabricated Houses

Beautiful Design Light Garage Steel Prefabricated Houses photo-1
Beautiful Design Light Garage Steel Prefabricated Houses photo-2
Beautiful Design Light Garage Steel Prefabricated Houses photo-3
Beautiful Design Light Garage Steel Prefabricated Houses photo-4
Beautiful Design Light Garage Steel Prefabricated Houses photo-5
Beautiful Design Light Garage Steel Prefabricated Houses photo-6
US$ 2,200 - 2,500 MOQ: 1 Unit
Key Specifications
Get Latest Price
Place of Origin:
Henan, China
Brand Name:
CANGLONG
Model Number:
HNGG-2
Payment & Shipping
Payment Methods:
Port of Shipment:
TianJin/Qingdao
Delivery Detail:
Delivery time depends on order quantity.
Place of Origin Henan, China
Brand Name CANGLONG
Model Number HNGG-2
Material Steel
Use Carport, Hotel, House, Other, Office, Shop, Toilet, Villa, Warehouse, Carport, Hotel, House, Kiosk,Booth, Office, Sentry Box,Guard House, Shop, Toilet, Villa, Warehouse, Workshop,Plant

light garage steel prefabricated houses

Company Information

Who Are We ?

  Thank you for your interest in Henan CangLong Steel Structures co,.ltd ,  We are a family owned business and have been in operation since 2007, who is specializing in post frame steel buildings. Our individually engineered permanent structures are the best choice for customers requiring speed of construction and economy coupled with aesthetic value. Our buildings are ideal for residential, commercial , agricultural ,industrial and chemical factories ,warehouses & stores , hospitals & clinics,multi-storey buildings , supermarkets ..

Why is CangLong Steel Structures the Right Choice?

  Your investment is an important decision and should be realized through a financially stable company.  Our deep community roots and stout economic strength gives us an exceptional advantage in hiring experienced professionals who will complete your project to your expectations.

The Edge

 Competitive Prices Our production capacity (approximately 20000 metric tons annually) together with effective

 and economic 

 engineering and manufacturing methods enable us to offer the most competitive prices in the industry.

Fast Quotations

 Quotations for simple buildings can be submitted quickly due to vast experience of our staff and the advanced 

software we use.

Fast Delivery 

 (1)We are able to design, detail, fabricate and supply simple buildings in approximately 4 weeks. 
 (2)Most of our buildings are delivered and erected within 8 weeks (this relies on various factors such as stock 

position, weather etc).
Site Supervision 

  (1)A site supervisor is always present at site to ensure that work is being carried out satisfactorily.
  (2)Any problems that arise are quickly dealt with to minimise any delays. 
  (3)Safety on site is also made a priority.


Our company workshop

beautiful design light garage steel prefabricated houses 

Advantages

1.It Is not affected by the chemical composition of steel, human factors, climate, power factors.

2.It can meet the requirements of environmental protection, no pollution, no fire operation safe and reliable construction.

3. Widly application range, which is suitable for connecting various range and same, different diameter of steel bar.

4.High strength, stable and reliable quality.

5. Simple operation, fast construction speed

6.It is Suitable for all kinds of tensile, compression force on the structures of reinforced concrete reinforced concrete structure in the connection construction.

7. Material saving, energy saving, not reinforced components and types of constraints.

8. Omnibearing connection.

9.It Can be advance to the system, factory work, does not occupy the time, all-weather construction.

Packaging & Shipping

Fixed packing, loading, transportation, unloading the matters needing attention:

(1) The lifting large there must be a person responsible for the use of fixture, suitable, strictly abide by the

rules of lifting, to prevent the occurrence of vibration, impact, deformation or damage, fall in the hoisting process.

(2) At the time of loading, there must be a special supervision, check car number and packing, the car pile

up securely, and to increase the necessary binding component loosening, prevent the loss.

(3) Remained stable in the transport process, the vehicle at the time of shipment, on the long, wide, high object transport, must be trained pilots, escort personnel responsible for, and mark is arranged on a vehicle.

(4) No rough handling, loading and unloading personnel handling, weight, size should be familiar with the components, and check the horse sling, rigging, prevent accidents.

(5) The member to the construction site, timely organization of unloading, stacking area.

(6) The crawler crane carrying member, should pay attention to the surrounding terrain, air condition, prevent the crawler crane overturning and component collision.

beautiful design light garage steel prefabricated houses 

FAQ

1. Common type of the industrial building?

Reply: Portal frame is the usual type in the industrial workshop and warehouse shed. Other types also could be designed and manufacturer as per clients’ request.

2. What’s the quality grade of the steel structure components?

Reply: Q345 is used for main steel structure, Q235 is used for secondary steel structure. 
3. 
How about the delivery time?
Reply: Usually,within 25-30 days after the order confirmed, also depends on the fabrication quantity.
4. 
How about the derust grade?
Reply: Ball blasting Sa2.5 on main steel structure; 
manual derust St2.0 on secondary steel structure.
5. 
What is kind panel used for the roof and wall?
Reply: Color corrugated steel sheet and sandwich panel could be used. Sandwich panel performs well on the heat insulation,sound insulation.Common sandwich materials are EPS, glass wool and PU.
6. 
How to install it?

Reply: We will furnish you the detailed construction drawing and the construction manual which could help you to erect and install the building step by step. We also could send the engineer to your local to help you if neede

7. Maintenance:

Reply: Finish paint need be done after the frame installed, and do it again after 6-8 months. So the surface will stay more time.

Send Inquiry to This Supplier

Message
0/5000

Want the best price? Post an RFQ now!
Business Type
Trading Company
Year Established
2008
Factory Size
Below 1,000 square meters
Total Employees
301 - 500 People