Supply Type Jelly Plugging Material
A, product introduction
Jelly type grouting plugging materials, polymer with water as dispersion medium, in a small amount of material mixed with plenty of water after rapid solidification, the formation of a white transparent soft elastomer, play the role of with water water, plugging, belongs to a new generation of environmental protection and energy saving grouting plugging material. Changed the traditional grouting material construction trival, nail is too dense, fine cracks in inflows, grouting equipment is not easy to clean.
Second, the product advantages
1. The materials of the provinces, the cost is low; Construction is convenient, fast.
2. The curing time is adjustable, fast curing needs 10 s to 60 s; Slow curing can be greater than 10 minutes.
3. Water curing has high flexibility, effectively resolves the problem of structure expansion.
4. Its effects are obvious, durable, not easy rebound.
5. In water curing of concrete in the case of no air long-term solid does not shrink.
6. Punching distance not to be too close, because the paste like water can flow into the cracks in the concrete in see, penetration ability.
7. To most of the acid and alkali has good chemical resistance, not affected by biological violation.
Three, scope of application
1. The tunnels, Bridges, subway, DAMS, harbor, civil air defense engineering, etc., hairline cracks of waterproof plugging, seepage control engineering.
2. Fill in building external walls, basement, honeycomb structure, brick materials, dry, wet the cracks on concrete members, the actual bond all contact surfaces, etc.
Four, ingredients
Slurry preparation should be carried out in front of the grouting operation. Matching: A component based agent, is A big bag packing; B component as curing agent, is a small bag packaging. A component + B components of common ratio is 1 kg material: 8 kg of water. Ingredients respectively take A material into A bucket can hold 20 kilograms, pour the B material into another bucket can hold 20 kilograms, then pour the two barrels with water, to stir to dissolve. Can also according to the structure of the appropriate increase or decrease 20% of the water.
Five, the method of use
1. The drilling in the region leakage.
2. The PU pipe embedded in the hole, staying out 20 cm long.
3. Around the pipe and the structure surface visible funnelled and plugging spirit closed fracture application. Before grouting, closed funnelled and fracture plugging spirit should be completely condensation curing, has certain strength before grouting.
4. Use tee connection embedded pipe grouting machine, open the power button, grouting operations, grouting pressure control between 0.2 to 0.8 MPa. According to the structure can be appropriately increased pressure, which can ensure slurry infiltrated the structure in the most subtle gap. But the biggest pressure cannot be more than 1 mpa.
5. If the structure surface slurry leakage phenomenon in the process of grouting, grouting operation should immediately stop, and adopt appropriate methods to closed funnelled then grouting operations. If the embedded pipe use one borehole embedded PU pipe has been blocked.
6. After filling, should immediately stop pouring, unplug the embedded pipe on the tee, to fold the embedded pipe, with fine wire tied up.
Six, matters needing attention
1. A and B components can't pour A bucket, otherwise you'll be set.
2. On the grouting machine, bucket, stirring stick mark clear in group A or group B, shall not be mixed, distinguish between if really, must be thoroughly cleaned rear can use, and mark, in order to avoid confusion again.
3. Grouting machine are installed on the PU tube plastic check valve, check valve to fail.
4. Configured grout as useless over that day, can be placed in a few days, but it must be stored in the shade and cannot be placed for a long time.
5. This product is afraid of light, heat, to put in a cool place without sunlight, should be kept below 40 ℃.
6. Completes the labor protection, to prevent slurry into the eyes. , into the skin of the case should be cleaned immediately with plenty of water.
7. On duty after grouting construction, the application of water grouting equipment cleaning, turn on the juice and water for 2 minutes.
8. When the water temperature is less than 5 ℃ in winter, should first to 10 ℃, 20 ℃, with warm water and then mixed with A and B components used, must not in material mixed with water again after heating.
9. The solidification time is adjustable, if you need quickly, add B material, if you want to adjust, add B less material.
10. The weight of the material and water than the biggest must not exceed 1:12, otherwise it will appear the phenomenon of coagulation, a long time don't even.
11. When the powder of A and B material cannot be mixed together, easy inflammable, explosive.
Seven, transportation, packaging specifications
4.5 kg, 9.0 kg net weight for two kinds of packaging. This product is not flammable explosive, according to ordinary goods transportation.
Contact: Li Zhengyan
Telephone: 13524065938
QQ: 2300276218
Send Inquiry to This Supplier
You May Also Like
-
Asphalt Waterproof MembraneNegotiableMOQ: 2400 Rolls
-
Epoxy Injection Packers for PU GroutingNegotiableMOQ: 1
-
Polymer Cement Based Waterproofing CoatingUS$ 1,900 - 3,000MOQ: 1 Ton
-
Artificial Marble for Room Covered High Glossy Water and Fire ProofUS$ 3 - 8MOQ: 300 Square Meters
-
Waterproof Pad for BabyUS$ 2 - 7MOQ: 3000 Packs
-
GCL Sodium Bentonite Waterproof BlanketUS$ 1 - 2MOQ: 3000 Square Meters
-
Foshan Shunde Lecong Furniture Market Business Visiting Assistant Traveling Service Sourcing Purchasing Delivery AgentUS$ 1 - 1,000MOQ: 1 Case
-
CROWN WATER PROOFING MEMBRANENegotiableMOQ: 1
-
PET/PP Needle Punched Nonwoven Geotextile 100gsmUS$ 0.1 - 0.6MOQ: 40 Rolls
-
Water Vapour BarrierUS$ 0.5 - 0.99MOQ: 5000 Square Meters



