PLASTIC PA11 NYLON PIPE EXTRUSION MACHINE

PLASTIC PA11 NYLON PIPE EXTRUSION MACHINE photo-1
PLASTIC PA11 NYLON PIPE EXTRUSION MACHINE photo-2
US$ 220,000 - 300,000 MOQ: 1 Set
Key Specifications
Get Latest Price
Condition:
New
Type:
Pipe Production Line
Pipe Material:
Other, PA
Payment & Shipping
Payment Methods:
Port of Shipment:
Qingdao CHINA
Delivery Detail:
Delivery time depends on order quantity.
Condition New
Type Pipe Production Line
Pipe Material Other, PA
Application Energy Supply Pipe
Production Capacity 30m per minute
Place of Origin Shandong, China
Brand Name DEYILI
Model Number SJPAG-20
Voltage 380v or other area requests
Power(W) 30kw
Dimension(L*W*H) 25m*3m*3m for PLASTIC PA11 PIPE PRODUCTION EXTRUSION LINE
Weight 23tons for PLASTIC PA11 PIPE PRODUCTION EXTRUSION LINE
Certification CE ISO for PLASTIC PA11 PIPE PRODUCTION EXTRUSION LINE
Warranty 1year for PLASTIC PA11 PIPE PRODUCTION EXTRUSION LINE
After-sales Service Provided Engineers available to service machinery overseas

The features of  PLASTIC PA11 NYLON PIPE EXTRUSION MACHINE

 PLASTIC PA11 NYLON PIPE EXTRUSION MACHINE

 

Product Description

 The production line is in compact structure with rational design and high efficiency. 

It adopts the special screw for Nylon in order to solve the key problem on the difficulty 

of the material extruding and forming. The production process is stable and easy to 

control. The unique on-line cutting unit makes sure pipes incision smooth. The Nylon pipes 

are widely used in the fields of auto brake fuel pipe, fuel-supply pipe, instrument line and 

air-conditioning system for its thermostablility, corrosion resistance, 

bright surface and high intansity.

 

Main Technical Parameter

Model

Pipe range

(mm)

Screw diameter(mm)

Max output

(kg/h)

Total install power (Kw)

Speed (m/min)

SJPAG-20

5-20

55/25

10-40

30

5-30

  

Packaging & Shipping

 Standard sea-worthy package mainly with wood pallets& film and some parts in plywood. In 1 40' containers.

 

Our Factory

PLASTIC PA11 NYLON PIPE EXTRUSION MACHINE 

 

FAQ

 

Payment terms

30% down payment after signing the contract within 5 workdays, 

the rest 70% payment after test run in our factory and before shipment.

Accepting& inspecting

 in seller's factory

Bring into the agreed time, it is in seller's factory to accept and inspect.

The test run will make the pipes under two sides discussion, and

promise the machine works in succession for two hours. 

Other special request, negotiate by two sides. 

The charge of test materials should be paid by buyer side.

Installation&test-run

in buyer's factory

1)User should prepare the plant, operators and tools for machine

installing, and make the energy available such as water, electricity,

materials, work space, labors and so on.

2)Seller send one engineer for direction and supervising the

installing, test run and training. The test run will be finished in 15 days 

if there is other requests please inform in advance.

3)The buyer should pay $100 per day as subsidy for the engineer, and

in addition the round airplane tickets, food, hotel fee and insurance of

the engineer during the installation and test-run period.

Documents supply

Mechanical and electrical operation manual(1), 

Electrical connection drawing(1),

And Operation technique manual(1).

 

Welcome for your visiting and discuss the details on the technical and process.

The concrete information please write to our sales.

 

 

Send Inquiry to This Supplier

Message
0/5000

Want the best price? Post an RFQ now!
Business Type
Manufacturer, Trading Company
Year Established
2006
Factory Size
10,000-30,000 square meters
Total Employees
51 - 100 People