Drilling Rig Matched Kelly Bar Shock Piling Spring, Piling Damping Spring
Drilling rig parts shock absorber spring matched kelly bar, rotary driver
Shock absorber spring used for kelly bar or rotary driver
Drilling rig kelly bar & spare parts
We supply all accessoreisfor rotary drilling rigs, like swivel joint, damper spring, motor, speed gearbox,damper rubber, base parts, like track roller, guide roller, gear ring, pulley etc.,
We have been supply one-stop service for rotary drilling rig since 2004 year, which specialize in producing kelly bar & spare parts, exported used drilling rigs, reapir & maintenanace.
We have been granted 10 patents by State Intellectual Property Office of P.R.China. For example, one of patents No.ZL2012 2 0161611L0, which is used for a multi locking type kelly bar. It's adapt to complicated geological condition and we get good feedback from Bauer, IMT, Soilmec, Mait, Liebherr, XCMG, SANY, Lovol, Yutong, Sunward, etc.
By the way, about kelly bar, We welcome any trusted foreign dealer cooperation in your local place.

High quality aluminum sheet wrapped kelly bar , wooden case for small accessories. The nearest port will be Tianjin port and Beijing airport, both ports are about one hour distance from factory.
YOU ARE MAKING SMART CHOICE
a) . Material & Technical---35CrMo / 27 SiMn / Q234B high alloy seamless steel pipe under quenched-tempered heat treament.
b) . Gold supplier on Alibaba with TRADE ASSURANCE to promise quality and delievery.
c) . Professional experienced R&D department, strictly QA&QC development.
d) . Feedback within 24 hours from professional consultors.
e) . Higher hardness, higher flexibility,excellent welding technology.
f ) . Thinner tube, smaller inter-tube distance, good abrasion resistance.
g) . Advanced technology of 6-key design, standard modular design.
1. Q: What's Material & Technology of Kelly bar?
A: 35CrMo / 27 SiMn / Q345B hIgh alloy seamless steel pipe under quenched-tempered heat treament.
2. Q: What's your delievery time of kelly bar?
A: Within 10 working days after confirmed deposit.
3. Q: What's your guarantee period of kelly bar?
A: 180 days under normal operation.
4. Q: What's your payment terms?
A: 30% T/T as advanced deposit,70% balance before shipment.
5. Q: Where your factory location?
A: Beijing in China, We welcome any visit and distributor cooperaton.
Send Inquiry to This Supplier
You May Also Like
-
ORIGINAL VOLVO Gear VOE14566431 APPLY For Volvo EC360BLC Excavator.US$ 6MOQ: 1 Unit
-
Heavy-Duty OIL FILTER W010502991 6086004 Oil Filter Element for Wheel Loader OEM Quality Engine ProtectionUS$ 18 - 20.00MOQ: 1 Unit
-
Original SDLG Parts Fuel Tank Breather (11210241) for LG6250E/LG6300E/LG6400ENegotiableMOQ: 1 Piece
-
2W3558 1411468 1229978 6V2406 8M5127 2796757 9L8439 1281663 380-1371 2624157 3700438 117-0159NegotiableMOQ: 1 Blade
-
Wholesale CAT336 Excavator Rock Bucket Volume 1.8CBM Heavy Reinforced Rocky Buckets for MiningUS$ 1500 - 3000MOQ: 1 Piece
-
For Komatsu WA600 Large Wheel Loader6.5m³ Cubic Mining Bucket (High Quality Mines)US$ 100MOQ: 1 Piece
-
Excavator Parts Main Pump PC200-3/5 HPV90 708-25-01064 708-2L-00460 708-2L-00300 Hydraulic Piston Pump for Komatsu ReplacementNegotiableMOQ: 1 Combo
-
Connector Sealing up Pipe Stop Water Hexagon Threaded Protection Hard PlugsNegotiableMOQ: 100 Pieces
-
Chromium Carbide Overlay Wear Plate Excavator Crusher Bucket LinerUS$ 399.69 - 399.69MOQ: 1 Square Meter
-
Original 390kw Weichai Wp13 Diesel Engine WP13G530E310 for Sany Mining Card SK80/SK90US$ 77815.12 - 80532.20MOQ: 1 Piece








