Construction Formwork/concrete Formwork Board With High Bearing Capacity
Specifications
Economic Climbing Formwork System CB210 with Adjustable Brace
Introduction
Plywood 18mm as the skin, timber beam H20 as the primary and secondary beam, steel prop or scaffolding as the support system.
Advantages:
Easy operation, save material and time.
High rigidity and repeat rate.
High standard components make low cost available.
The construction site is safe and fast.
H20 Timber Beam Specifications:
Product Name |
|
Height |
200mm |
Flange |
Wide*Thickness=80mm*40mm |
Spruce, Pine, a mixture of wood species permitted | |
Web |
Thickness:27-30mm |
3-plywood or plywood | |
Surface Protection |
The complete beam is waterproofed using a water-repellent color glaze |
Weight |
4.6-5.2kg |
Standard Lengths |
2.45m,2.65m,2.9m,3.3m,3.6m,3.9m,4.5m,4.9m,5.9m, (Max.length:6.00m) |
Shear Force |
q=11KN |
Permissible Bending Moment |
m=5.0KN*M |
Package |
Customized Package,or In Bulk |
Used for |
Slab Formwork System,Vertical Formwork(Wall,Column,Hydraulic Climbing etc.), Adjustable Arced Formwork etc |
Adjustable Waterproof Climbing Formwork With High Bearing Capacity
CB240 climbing system is mainly used for concrete pouring in the wall, the core wall, the pier, etc. They guarantee simple handling, fast concreting cycles and problem-free adjustment to different wall configurations.
Competitive Advantage:
1. High bearing capacity
The high loading capacity of the brackets allow very large scaffold units. This saves the number anchor points required as well as reducing climbing times.
2.Simple moving procedure by crane
Through the strong connection of formwork together with the climbing scaffold, both can be moved as a single climbing unit by crane. Thus valuable time-savings can be achieved.
3. Fast striking process without a crane
With the retrusive set, large formwork elements can also be retracted quickly and a minimum of effort.
4. Safe with work platform
The platforms have assembled firmly with bracket and will be climbing together, without scaffolding but can work safely in spite of your high location.
5. The inclination of formwork is adjustable by means of adjustable brace.
The brace is connected with formwork and bracket and the main function is guaranteeing the verticality of formwork by adjusting its length.
Package:
Applications:
As a kind of girder, it is an important constituent part for formwork and it is widely used in concrete formwork construction.

Send Inquiry to This Supplier
You May Also Like
-
48.3mm Yellow Scaffold Fitting Tube Pole Top Bolt Caps Scaffolding End CapUS$ 0.04 - 0.08MOQ: 1 Piece
-
China Wholesale Top Selling Products 2015 Scaffolding Plastic Screw End CapsUS$ 0.02 - 0.02MOQ: 10000 Pieces
-
Stainless Steel Knuckle Joint PinUS$ 3 - 5MOQ: 1000 Pieces
-
High Quality Scaffolding System Accessories Scaffolding Steel PlankUS$ 8 - 12MOQ: 1000 Pieces
-
Non Sparking Safety Hand Tools Parallel Vice HardwareUS$ 629.93 - 2,050.18MOQ: 1 Unit
-
China Honglu Structure Steel TrestleUS$ 1,300 - 1,400MOQ: 22 Tons
-
Zinc Plated Forged Antiluce Drop Lock PinUS$ 0.2 - 0.3MOQ: 1000 Pieces
-
Swivel or Double Scaffold Quick CouplerUS$ 0.4 - 4MOQ: 1000 Pieces
-
Construction Powder Coated/Hot Dip Galvanized Mobile Guard Rail H Frame Scaffolding SetUS$ 59 - 99MOQ: 1 Set
-
Ringlock SystemNegotiableMOQ: 5 Tons



