Smart Watch Android With GPS Real Time Location and Calling Function
1. 1.22'' colorful touch screen
2. calling watch
3. GPS/LBS/WiFi location
4. support Android and IOS app.
5. save-energy, long battery life
6. easy operate
Specification:
GSM frequency |
850/900/1800/1900MHZ WCDMA2100 |
GPS chip |
Ublox |
System |
Android 4.2 |
GPRS |
Class 12,TCP/IP build in GSM module |
GPS sensitivity |
-159dBm |
GPS accuracy |
10m (2D RM) |
GSM accuracy |
50-200m |
Maximum Elev |
18,000m |
Dimension of main body |
50*40*15.5mm (L*W*H) |
Net Weight |
45g |
Battery |
400mAh |
Company profile:
Any further questions please contact me freely!
Rdgs,
Lily Feng
skype: lilyfengfeng
ShenZhen CityEasy Technology
Send Inquiry to This Supplier
You May Also Like
-
Human Infrared Alarm, Outdoor Waterproof Sound and Light Alarm/Independent Version(Wechat:13510231336)NegotiableMOQ: 1000 Pieces
-
Computer Android HD Capacitive Touch Screen Pad Dual Core Dual Sim Bluetooth 3G TabletUS$ 54 - 60MOQ: 10 Pieces
-
OVER-EAR HEADPHONES FOR AKG K701NegotiableMOQ: 10 Pieces
-
High Quality 5.7 Inch Android Smart Phone With Best PriceUS$ 125 - 145MOQ: 1000 Pieces
-
Children's Smart Phone Positioning Watch/GPS Tracking WatchUS$ 0.0001 - 0.0001MOQ: 500 Pieces
-
2015 Touch Screen Health Care Smart WatchUS$ 36 - 90MOQ: 1 Unit
-
Child Touch Pen for IPhone / IPad / Most AppUS$ 0.15 - 1.5MOQ: 1000 Pieces
-
New S6 Rear Camera Lens Metal Protective Ring Guard Cover Protector for Samsung Galaxy S6 Edge Lens Protector Cover LPS6US$ 0.99 - 0.99MOQ: 1 Piece
-
Not Disturb Function Phone SetUS$ 15 - 25MOQ: 1 Piece
-
GSM Wireless Handheld Phone Quad Band 850/900/1800/1900MHZ Wireless Phone GSM Phone for Office Family Mine Remote Mountain UseUS$ 55 - 60MOQ: 1 Piece


