Home > Construction & Decoration > Shaped Building Material > Aluminum Profile > Innovative Design and Engineering Curtain Wall

Innovative Design and Engineering Curtain Wall

Innovative Design and Engineering Curtain Wall photo-1
US$ 2,400 - 3,500 MOQ: 5 Tons
Key Specifications
Get Latest Price
Place of Origin:
China
Grade:
6000 Series
Temper:
T3-T8
Payment & Shipping
Payment Methods:
Port of Shipment:
Shanghai
Delivery Detail:
Delivery time depends on order quantity.
Place of Origin China
Grade 6000 Series
Temper T3-T8
Application Glass Wall
Shape Other, all kinds of shape
Alloy Or Not Is Alloy
Model Number CW06
Brand Name HONGTENG OR OEM
Product Description
Material Alloy 6000 Series
Temper T3-T8.
Quality Standard GB5237-2008 equal to EN12020-1.2(2001)
Certifications CE,ISO9001, ISO14000,SUNCAP
Thickness of profile  Above 0.7mm; recommend 0.8-2.0mm and above, customized available
Surface Treatment Mill finish,Anodized, Electrophoresis, Powder coating, Wooden grain
Color

Anodized& Electrophoresis: silver, bronze, champagne, black,golden;etc

Powder coatingany color as the RAL international colour card sample

shows or your sample.

Wooden grain:  almost any colour

Various shapes are available

1, Thermal-break aluminum profiles

2, Sliding series

3, Side hung series

4, Closet door series

5, Shaped series

6, Handrail series

7, Decorative items - Golden oxidation & Wood grain transfer & others

8, Curtain wall series

9, Shower room frame and other frame

10, Industrial series
Length 1m-7m,Customized is available
Packing 1,Shrink film and plastic film,2, Shrink film and plastic film  EPE Fram,3, or your requirements. 
Time of samlple 10-15days,including making mould
Trade terms FOB Shanghai, CIF or CFR to the appointed port.
Lead time About 25 days for a 40' container
Average Anodizing thickness ≥10μm
Average power coating thinkness ≥40μm
Hardness(HW) ≥ 8
Tensile strength ≥ 16 mpa
Yield strength ≥ 110 mpa
Extensibility ≥ 8%

Ordering process:

1. Samples (0 to 7 days) 
2. Drawings confirmed (1 to 3 days)
3. Die/Mould Making (7 to 10 days)
4. Samples and colour confirmed (it won't stop until you confirm it)
5. Mass production (20 to 45 days) after deposit 

6.customer will check before shipping or SGS checking

7. pay the profile  and we loaded the container

   
Packaging & Shipping

  Packing: 1,Shrink film and plastic film  2, Shrink film and plastic film & EPE Fram  3, or your requirements.

 

Loading:

 

 

 

Company Information

 

 

We're at your service within 24 hours.

Skype: brucehu1998

 QQ: 517091295

 

Send Inquiry to This Supplier

Message
0/5000

Want the best price? Post an RFQ now!
Business Type
Manufacturer, Trading Company
Year Established
2006
Factory Size
10,000-30,000 square meters
Total Employees
301 - 500 People

Recommended Categories

Explore top categories and find suppliers for your specific needs