Low Cost Fabrication Shed Design Steel Building
Low cost fabrication shed design steel building
| 1 | Steel Structure Parts (Q235 or Q345) Hot galvanized or painted. | (1). Steel Column: H Section Steel |
| (2). Steel Beam: H Section Steel | ||
| (3). Withstand Wind Column: H Section Steel | ||
| (4). Connected beam: Circular Tube | ||
| (5). Roof Purline: cold formed galvanized C Section Steel | ||
| or Z Section Steel | ||
| (6). Wall purline: cold formed galvanized C Section Steel | ||
| or Z Section Steel | ||
| (7). End Wall purline: C Section Steel or Z Section Steel | ||
| 2 | Panel Material parts | (1). External Wall panel: (below is selectable) |
| 1) 50mm, 75mm or 100mm thickness EPS sandwich panel | ||
| 2) 50mm, 75mm or 100mm thickness Rockwool sandwich | ||
| panel | ||
| 3) 900# Corrugated Galvanized Steel sheet with different Color | ||
| 4) Kinds of PVC wall panel. | ||
| (2). Internal Wall panel: (below is selectable) | ||
| 1)50mm, 75mm or 100mm thickness EPS sandwich panel | ||
| 2) 50mm, 75mm or 100mm thickness Rockwool sandwich | ||
| panel | ||
| (3). Roofing panel: (below is selectable) | ||
| 1)50mm, 75mm or 100mm thickness EPS sandwich panel | ||
| 2)50mm, 75mm or 100mm thickness Rockwool sandwich | ||
| panel | ||
| 3)Corrugated Steel Sheet, and insulating layer if need. | ||
| 4)Corrugated PVC roof panel. | ||
| (4). Skylight: 820# Glass Fiber Reinforced Plastics (FRP) | ||
| 3 | Door and Window | (1). External Door ( Rolled up door or Sliding door ) |
| -1. Over-heat Orbit Sliding Door with double open | ||
| -2. Galvanized steel opening by power-operated Roller Door | ||
| (2). Internal Door: | ||
| 50mm Thickness EPS sandwich panel with aluminum alloy door frame | ||
| (3). Window: | ||
| PVC Window or aluminum alloy window frame with glass. | ||
| 4 | Drainage parts | (1).Galvanized water channel: |
| 2mm thickness galvanized steel water channel @ 3000mm or 2440mm/pcs | ||
| (2). Down spout: ∅110 PVC Down spout with Accessorie | ||
| 5 | Connecting Piece | (1) Purline draw bar: ∅12 |
| (2) Horizontal Bracing: ∅24 Circular Tube | ||
| (3) Knee-Bracing: L Steel | ||
| (4) Purline Drive pipe: Φ32*2 | ||
| (5) Column Bracing: ∅24 Circular Tube | ||
| 6 | Others | (1) Ventilating device |
| (2) Crane beam | ||
| (3) Canopy | ||
| (4) Bolt: Foundation bolt, High strengthen bolt, Normal bolts. | ||
Product show

Our factory have independent design institute and the Design qualification is the grade one .excellent design and the perfect price Beyond your imagination .If you want to a perfect warehouse and please provide to us that information wihich as follows;
Location (where will be built? ) _____country, area
2 Size: Length*width*height _____mm*_____mm*_____mm
3 wind load (max. Wind speed) _____kn/m2, _____km/h, _____m/s
4 snow load (max. Snow height)
_____kn/m2, _____mm
5 anti-earthquake _____level
6 brickwall needed or not If yes, 1.2m high or 1.5m high
7 thermal insulation If yes, EPS, fiberglass wool, rockwool, PU sandwich panels will be suggested; If not, the metal steel sheets will be ok. The cost of the latter will be much lower than that of the former.
8 door quantity & size _____units, _____(width)mm*_____(height)mm
9 window quanity & size _____units, _____(width)mm*_____(height)mm
10 crane needed or not If yes, _____units, max. Lifting weight____tons; Max. Lifting height _____m
we are big group factory and have more than 25 years experience of steel structure workshope project The first design&Engineering Service,Excellent product and perfect Has won the praise of customers and want to cooperation with more and more friends and customer add us team .

1. We have a group of professional engineers, most of whom has more than 10 years’ experiences in architecture field.
2. Established for more than ten years, our company has got a various of experiences in design, manufacture, installation and so on. The work staffs have excellent skills. Some of them had helped customers to install the warehouse around the world.
3. We also have possessed more than 80 sets of large precise and domestically advanced processing equipments, including large gantry planning machines, automatic submerged arc welding machines, assembling machines, slitters, shot blasting machines and so on.
4. Besides manufacture according to customers' requirements, we also established a set of production standards. With perfect technique, excellent quality, reasonable price, top-grade services, we have won the favor of lots of customers at home and abroad.
5. "Moral personality decides product quality." is our guarantee to the products. "Customers come first." is our everlasting pursuit. Believe your choice; we'll give you a satisfied answer.
1. Speed of construction and camp installation Allows for the building and the site work to be completed simultaneously, reducing the overall completion schedule, all the Main Structures will be connect with bolts, no welding works. All the wall and roof structure, flooring will be fixed by Self-tapping Screw or nails, normal Carpenter team could make a good job!
2. Economical Solution, compare to concrete building, prefabricated building will be much more Economical
3. Ability to service remote locations Assembling a work camp close to the work site reduces travel time which reduces cost.
4. Long time span Well-built modular worker camps can last for 10, 15 or 20 years or more.
5.Safe and stable, Earthquake resistance: Grade 7, Wind resistance: Grade 11(wind speed≤ 120km/h)

Send Inquiry to This Supplier
You May Also Like
-
Light Steel Structure Workshop(prefabricated House & Modular House)NegotiableMOQ: 1
-
Guangzhou Good Warehouse to RussiaUS$ 1 - 999,999,999MOQ: 1 Box
-
Best Quality Modular Warehouse Tent Building With Sandwich Panel Wall for StorageUS$ 30 - 80MOQ: 50 Square Meters
-
Prefabricted Steel Structural Roof Trusses WarehouseUS$ 15 - 30MOQ: 500 Square Meters
-
Cheap Light Prefab Low Price of Structural Steel Structure Workshop Warehouse ConstructionUS$ 5000 - 20000MOQ: 10 Tons
-
YAS4070 Outdoor Temporary Large Steel Frame Warehouse Storage TentUS$ 100 - 3,000MOQ: 5 Sets
-
Construction Steel Structure Multi Stroage BuildingUS$ 30 - 90MOQ: 300 Square Meters
-
Long Span Galvanized Steel Structure Low Cost Prefab WarehouseUS$ 20 - 70MOQ: 200 Square Meters
-
Office and Warehouse for Rent VietnamUS$ 100.00 - 100.00MOQ: 1000 Square Meters
-
China Custom Vacuum Forming Plastic Outdoor Portable Public ToiletUS$ 10 - 20MOQ: 100 Pieces











