1mw Hydro Power Plant Scada System

1mw Hydro Power Plant Scada System photo-1
1mw Hydro Power Plant Scada System photo-2
1mw Hydro Power Plant Scada System photo-3
1mw Hydro Power Plant Scada System photo-4
1mw Hydro Power Plant Scada System photo-5
1mw Hydro Power Plant Scada System photo-6
US$ 10 - 10,000 MOQ: 1 Unit
Key Specifications
Get Latest Price
Place of Origin:
Sichuan, China
Brand Name:
WA WU SHAN
Model Number:
hydro power
Payment & Shipping
Payment Methods:
Port of Shipment:
Shanghai or any port as required
Delivery Detail:
Delivery time depends on order quantity.
Place of Origin Sichuan, China
Brand Name WA WU SHAN
Model Number hydro power
Type Other, Hydro power

1mw hydro power plant scada system

 

 

 

Company Information

 Hongya Power Generating Equipment To Utilities Limited, is a professional manufacturer of water turbine (Francis turbine, pelton turbine, turgo turbine and kaplan turbine), AC three phase synchronous generator, speed governor and hardwares.

We supply equipments to hydro power project with water-to-wire system including  electro-mechanical equipments, scada system, excitation system, control panels, 6.3KV cubicles, power transformer, switchyard equipments etc.

Now we have many projects in China, Albania, Vietnam, Burma, Peru, Berlaus, Russia, Indonesia, Nepal, Turkey, Laos, Sri-lanka and we are working hard to provide qualified equipments worldwide for making a brighter world for everyone.We sincerely hope to cooperate with those who working in hydro power.

1mw hydro power plant scada system1mw hydro power plant scada system

 

 

Product Description

The microcomputer monitoring system of Hydropower Station is designed on the basis of unattended (minimal attendance) operation. The control, measurement, signal, information management of the station is realized through the microcomputer monitoring system. The monitoring system is of decentralized computer monitoring system and the computer monitoring system design follows the following principles:

1)    State-of-the-art computer software and hardware and network technology is introduced. When the system is put into operation, the station satisfies the requirement of unattended (minimal attendance) operation and management.

2)    Highly reliable system ensures the operation safety related indexes conform to the ministerial standard Fundamental technical requirements for computer monitoring system of hydroelectric power plants (DL/T578-95) and Technical regulations on the design of computer monitoring system for hydraulic power plants (DL/T5065-1999).

3)    In system configuration and equipment type selection, modular and structural design is considered for scaled extension.

4)    Conventional operation devices for emergency shutdown are equipped beside the generators and in the central control room (CCR) to ensure the safe operation of units in case of computer monitoring system failure.

1mw hydro power plant scada system

1mw hydro power plant scada system

Our Services

HPGE offer a comprehensive range of hydroelectric power plant solutions that cover the entire scope of service including: 

--Small hydro power project consultant

--Site management studies

--Equipments Design

--Hydroelectric equipemtns Manufacture

--Project management

--Installation guidance

--Commission and start operation

--Operation guidance

--Hydroelectric equipments maintainence

We'd love to cooperate with you for achivements as follow:

--Minimize the cost of the construction of the power plant with suitable technical proposal

--make better use of the water resource with higher efficiency

--easy and stable operation of the project with qualified equipments

 

 

Packaging & Shipping

Till 2015, we have exported hydro power equipment (water-to-wire system) to Albania, Vietnam, Burma, Peru, Berlaus, Russia, Indonesia, Nepal, Turkey, Laos, Sri-lanka etc, we have much experiments on standard package and shipping for better protection on the equipments.

1mw hydro power plant scada system1mw hydro power plant scada system

1mw hydro power plant scada system 

 

 

FAQ

How to inquire our product?

1. please send us the detailed parameters of the HPP

A water head----- m

B flow------ m³/s

C Installed capacity--- KW

D frequency---- 50HZ or 60HZ

E Generator excitation-- static SCR excitation or brushless excitation

Those parameters will decide which type of turbine and generator best satisfy your water condition.

 

2. Tell us your requirements of the water turbine generator unit.

A Does special material required for the equipments?

B Does the unit controlled manually or by computer?

C What should be quoted in the proposal?

Mechanical and Electrical part? Swithyard?

1mw hydro power plant scada system 

 

 

 

Send Inquiry to This Supplier

Message
0/5000
Want the best price? Post an RFQ now!
Business Type
Manufacturer, Trading Company
Year Established
2003
Factory Size
10,000-30,000 square meters
Total Employees
101 - 200 People

Recommended Categories

Explore top categories and find suppliers for your specific needs