Home > Construction & Decoration > Construction Equipment & Tools > Scaffolding Parts > Scaffolding Steel Plank Catwalk Plank Steel Toe Board

Scaffolding Steel Plank Catwalk Plank Steel Toe Board

Scaffolding Steel Plank Catwalk Plank Steel Toe Board photo-1
Scaffolding Steel Plank Catwalk Plank Steel Toe Board photo-2
Scaffolding Steel Plank Catwalk Plank Steel Toe Board photo-3
Scaffolding Steel Plank Catwalk Plank Steel Toe Board photo-4
Scaffolding Steel Plank Catwalk Plank Steel Toe Board photo-5
Scaffolding Steel Plank Catwalk Plank Steel Toe Board photo-6
US$ 8 - 20 MOQ: 1000 Pieces
Key Specifications
Get Latest Price
Place of Origin:
Jiangsu, China
Brand Name:
SunWay
Model Number:
Galvanized Safety Catwalk
Payment & Shipping
Payment Methods:
Port of Shipment:
shanghai
Delivery Detail:
Delivery time depends on order quantity.
Place of Origin Jiangsu, China
Brand Name SunWay
Model Number Galvanized Safety Catwalk
Type Scaffolding Parts
Scaffolding Part Type Scaffolding Planks

Scaffolding Steel Plank Catwalk plank Steel Toe Board

Product Description

Features of  scaffolding planks used for construction:

1.Material:Q235 steel

2.Length:1000/2000/1820/2050/3000mm (uesd for frame scaffolding/quickscaffolding/ringlock or caploack systerm,  and etc.)

3.Width: 240/480mm

4.Height:45mm

5.Thickness:2.5mm 

6.Hook: without or with hooks

7.Surface treatment: pre-galvanised or hot dip galvanised panel

8.Technic: Welded

9.Standard: fit for our demostic stardand & through SGS test.

10.Color: Silver

 

Advantage of  scaffolding planks used for construction:

 

1.good bearing capacity
2.durable & stable
3.easy to assemble & dismantle

 

Applications of scaffolding planks used for construction:

 

 1. Scaffolding planks used for construction   is used to walk through the scaffolding system or elevate the step on the scaffolding  more easier. 

 

2. Scaffolding planks used for construction   is dip painted and welded with CO2 arc which  provide longer protection from deformation, rustiness, and corrosion. 

 

3.A heavy duty scaffolding planks used for construction   is with hooks which can make  scaffolding planks used for construction  more sturdy.

 

Products show

Scaffolding Steel Plank Catwalk plank Steel Toe BoardScaffolding Steel Plank Catwalk plank Steel Toe BoardScaffolding Steel Plank Catwalk plank Steel Toe Board World galvanized steel plank is an ideal economical & eco-friendly scaffolding solution for scaffolding system and formwork system. A perfect choice for safety & low-cost & high-efficiency construction projects.
Better Side box design with better anti - deforming capability
Strengthen support designs with much stronger support force
500mm support spacing with better anti - deforming capability
Hot dip galvanizing surface & lifespan > 5 years
Punching design to anti-skid & lighten weight
Stiffener design to reinforce the load bearing capacity

Packaging & Shipping

Scaffolding Steel Plank Catwalk plank Steel Toe Board 

Factory Equipment

Scaffolding Steel Plank Catwalk plank Steel Toe Board 

Company Information

WuXi Leading Metal, SunWay has a long and proud history of customer service in China. The belief that our customers are our priority is core to the values of the SunWay people, whose talents and energy are aimed at building long term relationships with our customers by adding value to theirbusinesses.

Scaffolding Steel Plank Catwalk plank Steel Toe Board

Scaffolding Steel Plank Catwalk plank Steel Toe Board 

Certifications

Scaffolding Steel Plank Catwalk plank Steel Toe Board our service

1). We would strictly check the material, accessories of the product step by step before the order can be confirmed finally.
2). We have a quality checks team, every product would be checked before packed.
3). We would try our best to help you solve any problems within our circle of competence.
4). We would trace every phase of production from the beginning.

FAQ

Q1: How does your company do regarding Quality Control?
A1: Quality is very important and always be put at the first place. SY team members always pay great attention to quality controlling from the very beginning to the end.

 

Q2: Can I get some Samples?
A2: Yes, sure, we are honored to offer you samples.

Q3: What’s the delivery time?
A3: 15~30 days after T/T prepayment or L/C date.

Q4: What is your method of Transportation?
A4: We deliver by shipping,container,break bulk or as your requirements.

 

Q5: What can you do for us?
A5: We always shorten delivery time for our buyer.
We always package steel products well.
We always fix steel product in container well to make it safe arrive at destination port.
We always provide best and professional forward service and after sales service.

Scaffolding Steel Plank Catwalk plank Steel Toe Board

Send Inquiry to This Supplier

* Message
0/5000

Want the best price? Post an RFQ now!
Business Type
Manufacturer, Trading Company
Year Established
2013
Factory Size
5,000-10,000 square meters
Total Employees
51 - 100 People

Recommended Categories

Explore top categories and find suppliers for your specific needs